Loading...
English
10Nov

INSTALLATION OF NESTBOXES FOR THE LIFE-ZEPAURBAN PROJECT

Naturaleza del Sur is installing over 200 nestboxes in urban ZEPAs.

10Nov

LIFE-ZEPAURBAN PARTICIPATES IN A CONFERENCE ON CULTURAL HERITAGE BIO-THREATS

The LIFE-ZEPAURABAN Project has been invited to participate in the Conference on Cultural Heritage Bio-Threats that will be held from November 16 to 18 in San Cristóbal de La Laguna.

10Nov

THE URBAN SPA NETWORK IS GROWING!

Since the first SPA was declared within an urban center in Extremadura in 2004, this pioneering initiative has been widely accepted by different groups such as local and regional governments and conservation NGOs. However, while the network of urban SPAs in Extremadura grew to 19 declared spaces, no other region in the world had declared a building or group of buildings as a protected space because of its biodiversity value.

10Nov

ENCOURAGING RESULTS FROM THE LESSER KESTREL CENSUS

In the last year of the LIFE-ZEPAURBAN project, a complete census of all the urban SPAs that are part of its scope of action is planned. Nevertheless, following the criteria established by the scientific committee for the project (Action F2), in 2020 an attempt was made to count the largest possible number of SPAs in Extremadura in order to have information on population trends.

10Nov

THE LESSER KESTREL'S TOMIAL TOOTH

El increíble "diente de halcón" del cernícalo primilla es una eficaz herramienta para matar instantáneamente a sus presas pinzando las vértebras del cuello en los vertebrados y la base posterior de la cabeza en los insectos y otros invertebrados.

10Nov

2020 CENSUS FOR THE LESSER KESTREL COLONIES OF ALMENDRALEJO SPA

The Special Protection Area for birds known as "Lesser Kestrel Colonies of Almendralejo" is located within the urban core of said municipality and constitutes a space of unique characteristics since it houses one of the largest colonies of lesser kestrel in Extremadura located in a single building: approximately 98% of the pairs in the municipality nest on the roof and tower of the Nuestra Señora de la Purificación Church.

10Nov

2020 RELEASE OF CHICKS IN SAN VICENTE DE ALCÁNTARA

Between last May and June, the lesser kestrel chicks scheduled for release this year under the LIFE ZEPAURBAN Project were indeed released.

DEMA is a beneficiary partner of this Project and is responsible, among other things, for undertaking this action -- an action aimed at the production of chicks in the Lesser Kestrel Breeding Center and their release into the natural environment for the recovery of the urban SPA of San Vicente de Alcántara.

10Nov

MONITORING OF THE IMPACT OF THE PROJECT'S CONSERVATION ACTIONS ON THE LESSER KESTREL

Until February 15, 2020, works were carried out on different buildings in the network of urban SPAs in Extremadura where lesser kestrel colonies were located. Thus, works were carried out at the Mirabel Palace of the Plasencia SPA, Santa María Church of the Brozas SPA, Santa María Church at the Garrovillas de Alconétar SPA, Nuestra Señora de la Candelaria Church at the Zafra SPA, and San Fulgencio Church at the Acedera SPA, as well as at the silos in the Trujillo SPA and the La Visitación Convent in Puebla de Alcocer.

 

10Nov

LIFE-ZEPAURBAN AT THE CONSERVATION OF STEPPE BIRDS AND SUSTAINABLE AGRICULTURE CONFERENCE

On October 14, LIFE-ZEPAURBAN will participate in the final Steppes of La Mancha Conference. This is an online conference in which professionals, experts, and businessmen responsible for initiatives to enhance the natural heritage with a special focus on the conservation of steppe birds and the general biodiversity of the agricultural landscape will participate. Registration is already open and you can check out the program at this link:

https://estepasdelamancha.es/congreso-final-estepas-de-la-mancha/

10Nov

VISIT OF THE EXTERNAL TEAM FROM THE EUROPEAN COMMISSION TO THE LIFE ZEPAURBAN PROJECT

Last week, the LIFE-ZEPAURBAN Project received a visit from Sara Mora, from the NEEMO-IDOM external team of the European Commission, so that she could see firsthand how the project is unfolding. On Monday the 9th, a meeting of all the partners was held in Mérida in which the development of the project's main actions was reviewed and their future was analyzed.